Sunday, June 23, 2013

MINI PROJECT - 2ND WEEK (24-06-2013 TO 30-06-2013)

BHARAT INSTITUTE OF ENGINEERING AND TECHNOLOGY
Department of Civil Engineering
MINI PROJECT

PROJECT REPORT FOR THE PERIOD OF 24-06-2013 TO 30-06-2013

1.       List out Items of work of a building construction with unit of measurement
2.       List out materials used in building construction? Identify their properties
3.       List of equipment and machinery used in building construction
4.       List out common mix proportions used for various items of work
a.       PCC
b.      Brickwork
c.       Stone Masonry
d.      Plinth Beams
e.      Columns
f.        Roof Beams
g.       Roof Slab
h.      Staircase & Lift

5.       Explain Nominal Mix vs Design Mix
6.       Draw Sectional Elevation of given block.
7.       Work assigned by external guide (Project Engineer) and Status of Completion

No comments:

Post a Comment