Sunday, June 16, 2013

MINI PROJECT REPORT FOR THE PERIOD OF 17-06-2013 TO 23-07-2013

BHARAT INSTITUTE OF ENGINEERING AND TECHNOLOGY
Department of Civil Engineering

MINI PROJECT

PROJECT REPORT FOR THE PERIOD OF 17-06-2013 TO 23-07-2013

1.       Block No.
2.       Slab Area in Sft/Sqm
3.       Plan of Block
4.       List of Items of work to be executed in the month of June’13
5.       No. of Columns
6.       Maximum size of Column with Steel Reinforcement Details

7.       Work assigned by External Guide (Project Engineer) and Status of Completion

No comments:

Post a Comment