Friday, October 25, 2013

Estimating and Costing - Model Questions


Estimating and Costing
Model Questions

Unit 5

1.    A Simply Supported Beam 230mm x 300mm  size of 4m clear span is reinforced with 3 bars of 20mm dia. Stirrups with 8mm dia. are provided at 200mm c/c. Calculate quantity of steel. Draw the sketch showing details of steel reinforcement. Assume missing data.

2.    A Cantilever Beam of 230mm x 450mm  size of 2m clear span is reinforced with 4 bars of 16mm dia. Stirrups with 8mm dia. are provided at 200mm c/c. Calculate quantity of steel. Draw the sketch showing details of steel reinforcement. Assume missing data.

3.    A One-way slab for a room of 3m x 7m size is provided with 120mm thick slab. Main Steel Reinforcement is 8mm dia. at 150mm c/c. Find Steel Required. Assume Missing Data.

4.    A RCC Square Column of 300mm x 450mm size of 3m height above plinth beam is reinforced with 4 bars of 20mm dia. Lateral ties with 8mm dia. are provided at 200mm c/c. Calculate quantity of steel? Assume depth of foundation below Plinth beam is 2m. Draw the sketch showing details of steel reinforcement

Unit 6

1.    Explain: a) Security Deposit   b) Arbitration
2.    Explain various types of Tenders?
3.    Explain various types of Contracts?
4.    Explain about Tender Notice?

Unit 7

1.    Explain various methods of Valuation of Buildings?
2.    Explain necessity of Valuation?
3.    Explain various methods of calculation of depreciation?
4.    Explain factors affecting Valuation of Property?

Unit 8

1.    Give the detailed specifications of the following items of works.
a.       (a) Painting            (b) Flooring
2.    Give the detailed specifications of the following items of works.
a.    (a) PCC (1:4:8)            (b) Brickwork with 1st Class Bricks
3.    List and explain standard specifications of a first class building?
4.    Give the detailed specifications of the following items of works.

a.    (a) RR Masonry            (b) Plastering