1. A Simply Supported Beam 230mm x 300mm
size of 4m clear span is reinforced with 3 bars of 20mm dia. Stirrups with 8mm
dia. are provided at 200mm c/c. Calculate quantity of steel. Draw the sketch
showing details of steel reinforcement. Assume missing data.
2. A Cantilever Beam of 230mm x 450mm
size of 2m clear span is reinforced with 4 bars of 16mm dia. Stirrups with 8mm
dia. are provided at 200mm c/c. Calculate quantity of steel. Draw the sketch
showing details of steel reinforcement. Assume missing data.
3. A One-way slab for a room of 3m x 7m
size is provided with 120mm thick slab. Main Steel Reinforcement is 8mm dia. at
150mm c/c. Find Steel Required. Assume Missing Data.
4. A RCC Square Column of 300mm x 450mm
size of 3m height above plinth beam is reinforced with 4 bars of 20mm dia. Lateral
ties with 8mm dia. are provided at 200mm c/c. Calculate quantity of steel?
Assume depth of foundation below Plinth beam is 2m. Draw the sketch
showing details of steel reinforcement
Unit 6
1.
Explain:
a) Security Deposit b) Arbitration
2.
Explain
various types of Tenders?
3.
Explain
various types of Contracts?
4.
Explain
about Tender Notice?
Unit 7
1.
Explain
various methods of Valuation of Buildings?
2.
Explain
necessity of Valuation?
3.
Explain
various methods of calculation of depreciation?
4.
Explain
factors affecting Valuation of Property?
Unit 8
1.
Give
the detailed specifications of the following items of works.
a. (a) Painting
(b) Flooring
2.
Give
the detailed specifications of the following items of works.
a. (a) PCC (1:4:8)
(b) Brickwork with
1st Class Bricks
3.
List
and explain standard specifications of a first class building?
4.
Give
the detailed specifications of the following items of works.
a.
(a)
RR Masonry (b) Plastering