|
S NO
|
ROLL NO
|
NAME
|
I would like to do as a Project Lead
|
I am planning to do at Govt. organization
|
My Area of Interest is
|
Choose Guide
|
|
1
|
08E11A0116
|
T.JOYCE RAJ PRANAYA
|
YES
|
YES
|
Water Resources
Engineering
|
P RAMBABU
|
|
2
|
08E11A0119
|
MERCY RAJ PRANAVI
TALLURI
|
YES
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
3
|
10E11A0103
|
T.BHARATH CHANDER
|
NO
|
YES
|
Geo-technical
Engineering
|
P SRINIVAS
(Geo-technical)
|
|
4
|
10E11A0105
|
L.DEEPTHI
|
NO
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
5
|
10E11A0106
|
N.DIVYA SRI
|
NO
|
YES
|
Remote Sensing &
GIS
|
|
|
6
|
10E11A0107
|
EJAZ AHMED
|
NO
|
YES
|
Transporation
|
ARATI REDDY
|
|
7
|
10E11A0108
|
B.HARISH
|
NO
|
YES
|
Structures
|
ARATI REDDY
|
|
8
|
10E11A0111
|
GADDI KARTHIK KUMAR
|
NO
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
9
|
10E11A0113
|
K.MADHUSUDHAN
|
NO
|
YES
|
Transporation
|
ARATI REDDY
|
|
10
|
10E11A0114
|
P.MADHUSUDHAN REDDY
|
NO
|
YES
|
Geo-technical
Engineering
|
P SRINIVAS
(Geo-technical)
|
|
11
|
10E11A0115
|
L.MAHENDAR
|
NO
|
YES
|
Structures
|
P RAMBABU
|
|
12
|
10E11A0116
|
MAHESH CHEGOORU
|
NO
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
13
|
10E11A0121
|
KOMPALLY.NANDA KISHORE
|
YES
|
YES
|
Structures
|
P RAMBABU, ARATI REDDY
|
|
14
|
10E11A0123
|
T.NAVEEN KUMAR
|
YES
|
YES
|
Structures
|
C PREETI (Structures)
|
|
15
|
10E11A0124
|
NEHA SHIREEN
|
NO
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
16
|
10E11A0130
|
G RAVI TEJA
|
NO
|
YES
|
Structures
|
P RAMBABU
|
|
17
|
10E11A0131
|
Y.ROHIT SAI SANJEEV
|
YES
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
18
|
10E11A0132
|
SAHITH REDDY MUDIGANTI
|
NO
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
19
|
10E11A0135
|
G.SHIRISHA
|
NO
|
YES
|
Structures
|
ARATI REDDY
|
|
20
|
10E11A0136
|
D.SINDHU REDDY
|
NO
|
YES
|
Remote Sensing &
GIS
|
ARATI REDDY
|
|
21
|
10E11A0141
|
SUKESH KADIYAM
|
NO
|
YES
|
Geo-technical
Engineering
|
P RAMBABU, P SRINIVAS
(Geo-technical)
|
|
22
|
10E11A0142
|
SUPRIYA
|
NO
|
YES
|
Geo-technical
Engineering
|
P SRINIVAS
(Geo-technical)
|
|
23
|
10E11A0144
|
SUSHMITA
|
YES
|
YES
|
Geo-technical
Engineering
|
P SRINIVAS
(Geo-technical)
|
|
24
|
10E11A0145
|
B.SWATHI
|
NO
|
YES
|
Structures
|
P RAMBABU, ARATI REDDY
|
|
25
|
10E11A0149
|
VENKATAREDDY J
|
NO
|
NO
|
Construction
Management
|
P RAMBABU
|
|
26
|
10E11A0150
|
VIJAY.B
|
NO
|
YES
|
Structures
|
P RAMBABU
|
|
27
|
10E11A0151
|
VIKAS GOPAGANI
|
YES
|
YES
|
Structures
|
P RAMBABU, ARATI REDDY
|
|
28
|
10E11A0152
|
VIKAS.KONGA
|
YES
|
YES
|
Transporation
|
ARATI REDDY
|
|
29
|
10E11A0153
|
G.VINAY KUMAR
|
NO
|
YES
|
Transporation
|
ARATI REDDY
|
|
30
|
10E11A0154
|
J VINEETH REDDY
|
NO
|
YES
|
Remote Sensing &
GIS
|
P RAMBABU
|
|
31
|
10E11A0155
|
SURAJ SAHANI
|
NO
|
YES
|
Remote Sensing &
GIS
|
P RAMBABU
|
|
32
|
10E11A0158
|
YESHWANTH VEMURI
|
YES
|
YES
|
Remote Sensing &
GIS
|
P RAMBABU
|
|
33
|
10E11A0159
|
M,MANOJ REDDY
|
NO
|
YES
|
Structures
|
C PREETI (Structures)
|
|
34
|
10E11A0159
|
M,MANOJ REDDY
|
NO
|
YES
|
Structures
|
C PREETI (Structures)
|
|
35
|
10E11A0160
|
R.SRAVANI REDDY
|
NO
|
YES
|
Structures
|
P RAMBABU, ARATI REDDY
|
|
36
|
11E015A103
|
CH.SANTHOSH
|
NO
|
YES
|
Transporation
|
ARATI REDDY
|
|
37
|
11E15A0101
|
S.SRILATHA
|
NO
|
YES
|
Water Resources
Engineering
|
P RAMBABU
|
|
38
|
11E15A0102
|
V.VINODKUMAR
|
NO
|
YES
|
Transporation
|
ARATI REDDY
|
|
39
|
11E15A0104
|
A.PRAVEEN KUMAR
|
YES
|
YES
|
Structures
|
C PREETI (Structures)
|
|
40
|
11E15A0105
|
D.NARSAMMA
|
NO
|
YES
|
Water Resources
Engineering
|
P RAMBABU
|
|
41
|
11E15A0106
|
S.AMRUTHA
|
NO
|
YES
|
Water Resources
Engineering
|
P RAMBABU
|
|
42
|
11E15A0107
|
B SAI KUMAR
|
NO
|
YES
|
Structures
|
|
Department of Civil Engineering of BHARAT INSTITUTE OF ENGINEERING AND TECHNOLOGY (BIET), Ibrahimpatnam, Hyderabad, is established in the year 2008. The department offers B.Tech course with an intake of 120 students.
Tuesday, December 10, 2013
Major Project - Student Options as on 10-12-2013
Monday, December 9, 2013
Friday, November 8, 2013
M. Tech (Structures) - Mid Exam I Time Table
BHARAT INSTITUTE OF ENGINEERING
& TECHNOLOGY
DEPARTMENT OF CIVIL ENGINEERING
I SEMESTER M. Tech (STRUCTURAL ENGINEERING)
MID – I EXAM NOVEMBER – 2013
TIME TABLE
DATE
|
10:30 TO
12:00
|
2:00 TO
3:00
|
11/11/2013
|
Computer Oriented Numerical Methods
|
Theory of Elasticity and plasticity
|
12/11/2013
|
Theory and Analysis of plates
|
Advanced Reinforced Concrete Design
|
13/11/2013
|
Elective –I Concrete Technology
|
Elective –II Soil Dynamics and foundation
Engineering
|
Theory subjects:
75 marks shall
be awarded based on the performance in the End Semester Examination and 25
marks shall be awarded based on the Internal Evaluation. The internal
evaluation shall be made based on the average
of the marks secured in the two Mid Term-Examinations conducted-one in the
middle of the Semester and the other immediately after the completion of
instruction. Each midterm examination shall be conducted for a total duration of 120 minutes with Part A as one compulsory question for 10
marks and Part B with 3 questions to
be answered out of 5 questions each question for 5 marks. If any candidate is
absent from any subject of a mid-term examination, an on-line test will be
conducted for him by the University. End semester examination is
conducted for 75 marks with Part A as a compulsory question for 25 marks and
Part B for 50 marks with 5 questions to be answered out of 7 questions.
Practical subjects:
75 marks shall
be awarded based on the performance in the End Semester Examinations and 25
marks shall be awarded based on the day-to-day performance as Internal Marks.Monday, November 4, 2013
Estimating and Costing - Assignment for Mid II
Estimating and Costing
Assignment
(i)10 mm dia main bars are provided in shorter span direction at 150 mm c/c. Alternative bars are bent up near the support and all bars are hooked at both ends.
(ii) 8 mm dia distribution bars are provided in longer span direction at 200 mm c/c. To hold the bent up bars in position 3 no’s distribution bars are provided on each side at top.
(iii) Cover: Bottom and top cover to reinforcement taken as 15 mm and end cover of 25 mm is provided.
2. Calculate the standard rent of a government residential building newly constructed from the following data:
Cost of land = Rs. 1,00,000/-
Cost of construction of the building = Rs. 4,00,000/-
Cost of roads within the compound and fencing= Rs. 20,000/-
Cost of sanitary and water supply works = 8% of the cost of the building.
Cost of electrical installation including fans = 10% of the cost of the building.
Municipal house tax = Rs. 4,000/-per Annum.
Water tax = Rs. 1,200/-per Annum.
Property tax = Rs. 1,000/-per Annum.
Friday, November 1, 2013
Concrete Technology & Highway Materials Lab
Concrete Technology & Highway Materials Lab
Marks: 50
Theory: 20
Experiment: 15 + 5*
Viva-Voce: 10
* Discipline including Formal Dress, Shoe, ID Card, and Lab Record
- Write down the experimental procedure of Fineness of Cement
- Write down the experimental procedure of Slump Test
- Write down the experimental procedure of Normal Consistency of Cement
- Write experimental procedure of Impact Value Test for Coarse Aggregates
- Write down the experimental procedure of Shape Tests
Part B: (5 Marks)
- Explain desirable properties of Bitumen?
- Explain Admixtures?
- Explain Workability?
- Explain Physical Properties of Cement
- Explain Factors affecting the strength of concrete?
Environmental Engineering Lab
Marks: 50
Theory: 20
Experiment: 15 + 5*
Viva-Voce: 10
* Discipline including Formal Dress, Shoe, ID Card, and Lab Record
- Write down the experimental procedure on determination of Total Hardness of water.
- Write experimental procedure on determination of dissolved oxygen content of water.
- Write down the experimental procedure on determination of Chlorine Demand of water.
- Write down the experimental procedure on determination of Chlorides of water.
- Write down the experimental procedure on determination of pH, conductivity of water.
Part B: (5 Marks)
- What are the pH value ranges for acidic and alkaline solutions?
- Explain D.O. Test.
- Explain Reagent?
- What are the effects of fluorides present in water.
- Bleaching powder in water is mixed for?
Subscribe to:
Comments (Atom)